Publication of results from the preliminary site investigations – Offshore wind North Sea

Publication of results from the preliminary site investigations – Offshore wind North Sea

In relation to the tendering of the offshore windfarms of the Energy Island North Sea, a range of preliminary investigations and environmental assessments are being carried out.

Results in the form of reports and data from the completed investigations can be accessed directly here at this site (reports) and through access to a FTP site (data), which is maintained by Energinet. All results from the preliminary investigations etc. are targeted potential bidders for the offshore windfarms of the Energy Island North Sea.

If you want to be notified when new data or reports are being published, please send an email to the following address specifying the email address you wish to register: energyislands@ens.dk.

Access to Energinet's FTP site

Access to Energinet’s FTP site is obtained in the following way:

Step 1: Interested bidders can request access to the data by notifying the Danish Energy Agency. Send the request to Sofie Bille Bruun, email sbbn@ens.dk , and include the following information:

Applicant name (company name or name of the consortium)

Applicant’s contact person, (name)

Applicant’s contact person, (email)

Applicant’s contact person, (telephone number)

Step 2: Energinet will thus send instructions to the applicant on access to the FTP server with username and password.

The FTP website will be updated in accordance with the plan mentioned in the table below. Reports, which are related to the environment and other reports, which do not require FTP server, will be posted on this page.

We aim to process requests within five working days, bank holidays and holiday excluded.

Results from preliminary investigations as well as data for the offshore windfarms in the North Sea

Below you can find the list of all investigations to be carried out including notes describing the reports. Included in the list the timing of the publishing of the reports is mentioned.

Metocean

ID

Deliverables

Date

Note

2101

LiDAR Buoy Measurements (data)

Apr 2022

Notes on reports

2102

Measurements Offline Instruments (data)

Apr 2022

Notes on reports

2103

LiDAR Buoy Monthly Measurement Report

Jan 2024

Notes on reports

2104

Supplementary Measurement Reports Offline Instruments

Feb 2024

 

2105

Final Measurements Report

Feb 2024

 

2106

Measurement Plan

Apr 2022

Published on FTP-server

2107

Site Metocean Conditions Assessment Report

Jun 2023

 
Note Reassessment Site Metocean Conditions Mar 2024
2108 Site Wind Conditions Assessment Report Jun 2023  
Note Reassessment Site Wind Conditions Mar 2024
2109 Feasibility Statement From Certification Body Nov 2024  

 

Technical reports and reports on environment

ID

Deliverables

Date

Note

2201

Visibility analysis

May 2023

2202

Benthic fauna and flora

Jun 2023

 

2203

Marine mammals (Year 1)

Jun 2023

 

2204

Marine mammals (Final)

Mar 2024

 

2205

Birds (Year 1)

Aug 2023

 

2206

Birds (Final)

Mar 2024

Update June 2024 

2207

Bats

Feb 2024

 

2208

Fish and fish populations

Mar 2024

 

2209

Fisheries

Aug 2023

 

2210

Underwater noise and vibrations

Jun 2023

 

2211

Radar and radio interference

Apr 2023

 

2212

Marine traffic and safety of navigation (HAZID)

May 2023

 

 

Seabed investigations

ID

Deliverables

Date

Note

2301

Geology and sea-level, desk study

Nov 2021

Published

2302

Arkivalsk kontrol og arkæologisk analyse

Marine archaeology: archaeological analysis, desk study

Nov 2021

Published

2303

Geophysical site survey, report

June 2023

 

2304

Preliminary geotechnical investigations, report

June 2023

 

2305

Integrated 3D geological model

Feb 2024

 

2306

UXO threat and risk assessment, report

Feb 2022

Published

2307

Marine archaeology: Geo-archaeological analysis, report

June 2023

 

2312 Ground conditions risk assessment - North Sea - Energy Island/Wind Jan 2023 Published

 

Strategic environmental assessment (SEA) 

ID

Deliverables

Date

Note

2401

Scoping of Strategic Environmental Assessment (SEA) for the Plan for Programme North Sea Energy Island

(Afgrænsningsudtalelse for miljøvurderingen af plan for Program Energiø Nordsøen)

Jan 2023

Published

2402

Strategic Environmental Assessment Report (SEA)

(Miljørapport)

Jun 2023

 

2403

The Plan for Programme North Sea Energy Island

(Plan for Program for Energiø Nordsøen)

Feb 2024

 

2404

SEA summary statement

(Sammenfattende redegørelse)

Feb 2024

 

 

Onshore environmental impact assessment 

ID

Deliverables

Date

Note

2405

Scoping of environmental impact assessment (EIA) onshore

(Afgrænsningsudtalelse for miljøvurdering (VVM) af landanlægget)

TBD

 

2406

Environmental impact assessment report (EIA) onshore

(Miljøkonsekvensrapport landanlæg)

TBD

 

2407
 

Environmental impact assessment (EIA) permit onshore

(§25-tilladelse - landanlæg)

TBD