Kriegers Flak

Published material

Here you can find material previously published in connection with news.

Tender Documents

Tender conditions for Kriegers Flak, July 2016 (Eng) (pdf)

Tender conditions for Kriegers Flak, July 2016 (Eng) (word)

Tender conditions for Kriegers Flak, July 2016 (danish) (pdf)

Tender conditions for Kriegers Flak with track changes, July 2016 (danish) (pdf)

Tender conditions for Kriegers Flak, July 2016 (danish) (word)

 

Grid Connection

C1677A_46005705_a_R1

Prelim KFA LAYOUT For information only

Prelim KFB LAYOUT For information only

Prelim KFE LAYOUT For information only

Previous Prelim Published layout Drawings

EIA reports

Reply to ESPOO response_2nd hearing_2016

Summary statement report on the EIA Report (in Danish)

EIA part 1: Non-technical resume (in English)

EIA part 1: Non-technical resume (in Danish)

EIA part 2: Purpose and background (in Danish)

EIA part 3: The marine environment (in Danish)

EIA part 4: Onshore installations (in Danish)

EIA part 5: Summary (in Danish)

Background reports

Area calculation for off shore wind farms (in English)

Arealberegning for havvindmøller (in Danish)

Arealinteresser (in Danish)

Arkæologisk analyse (in Danish)

Befolkning, sundhed og socioøkonomi (in Danish)

Fisk og fiskeri (in Danish)

Flytrafik (in Danish)

Hydrografi (in Danish)

Landskab, kulturhistorie og visuelle forhold (in Danish)

Luftforurening (in Danish)

Natur (in Danish) - bemærk rapporten er opdelt i 7 dele grundet filens størrelse:

Projekt- og anlægsbeskrivelse landanlæg (in Danish)

Radar og radiokæder (in Danish)

Sedimentforhold (in Danish)

Sejladsforhold (in Danish)

Støj (in Danish)

Visualiseringer (in Danish)

Landskab og vurderinger af visuelle forhold (in Danish)

Øvrige miljøforhold (in Danish)

Appropriate Assessment (in English)

Benthic habitats and communities (in English)

Birds and bats (in English)

Marine mammals (in English)

Underwater noise modelling (in English)

Technical project description (in English)

Legal material

02.05.2016: Guideline underwater noise

14.09.2015: Draft on a review clause setting out the more detailed rules on permitted changes to the concessionaire after signing the concession agreement

18.06.2015: The executive presentation on the possibility of changing tenderer

03.06.2015: The executive presentation on joint and several liability (pdf)

05.12.2014: Guideline underwater noise OLD VERSION (see updated 02.05.2016)

22.02.2013: Prior information notice on Horns Rev 3 and Kriegers Flak

08.02.2013: Prior Information Notice

07.02.2013: Instructions Horns Rev 3 and Kriegers Flak

 

Tender conditions for Kriegers Flak Offshore Wind Farm Draft for final tender conditions - June 2016 Revised 8 July 2016

Betingelser for udbud af etablering af havmølleparken Kriegers Flak Udkast til endelige udbudsbetingelser juni 2016. Revideret 8. juli 2016.

Betingelser for udbud af etablering af havmølleparken Kriegers Flak Udkast til endelige udbudsbetingelser. Revideret 8. juli 2016 (med ændringsmarkering)

 

08.12.2015 Bilag 6.1.1.-6.1.3. Samarbejdsaftale under Etablering (Energinet.dk) Kriegers Flak

08.12.2015 Appendix 6.1.1.-6.1.3. Collaboration Agreement during the Construction Phase (Energinet.dk) Kriegers Flak

08.12.2015 Appendix 6.3. Assessment of safety navigation in connection with marine construction works (Kriegers Flak)

08.12.2015 Appendix 6.4. EUROCONTROL Guidelines (Kriegers Flak)

08.12.2015 Market and Technical framework for the Danish Kriegers Flak offshore wind park

 

15.09.2015: Pre-Qualification Questionnaire (PQQ) for Kriegers Flak here (pdf) and here (word)  (with a minor correction on page 12 section C2.ii from the PQQ published 07.09.2015)

07.09.2015: Pre-Qualification Questionnaire (PQQ) for Kriegers Flak here (pdf) (with a minor correction on page 6 section A3.1 from the PPQ published on 03.06.2015). The PQQ has been updated on 15.09.2015 due to a minor error.

03.06.2015: Pre-Qualification Questionnaire (PQQ) for Kriegers Flak here (pdf). The PQQ has been updated on 07.09.2015 due to a minor error.

03.06.2015: The forms necessary for pre-qualification here (pdf)

06.05.2015: Contract Notice for Kriegers Flak

06.05.2015: Response to Dialogue

03.11.2014: Kriegers Flak Instructions to Energinet.dk (Danish)

07.02.2013: Requirements EIA Statement Kriegers Flak

19.02.2015: Underwater noise in relation to pile driving – Working Group 2014

Presentations and meetings

19.09.13: Horns Rev 3 & Kriegers Flak Platform Interfaces presentation

 

Invitation to dialogue: Summary of the market response followed by an evaluation by the DEA.

Appendix: Horns Rev 3 and Kriegers Flak Offshore Windfarm - Responses to detailed questions in the invitation to dialogue

Invitation to dialogue Tenders for Horns Rev 3 and Kriegers Flak

Horns Rev 3 and Kriegers Flak Offshore Wind Farms – Questions related to Geo Investigations (UXO, geophysical, geological, geotechnical)

Single line diagram for 200 MW: KFA-KFB 220-33kV 200MW platform

Single line diagram for 400 MW: KFA-KFB 220-33kV 400MW platform

Kriegers Flak - Grid Connection ready on January 1st 2019

 

KRIEGERS FLAK MetOcean metodology & Existing Data

HR3 meeting at ENS -11.02.2014 – on grid code compliance

Timeline for Kriegers Flak

 

Offshore Wind Farms (OWF) - Horns Rev 3 and Kriegers Flak - Geo Investigations 2012-2013

HR3 & KF Geo Investigations UXO Desk Study 2012

Offshore Wind Farms Horns Rev 3 and Kriegers Flak Geo investigations 2012-2013 and MetOcean Time schedule

METOCEAN Kriegers Flak & Horns Rev 3

Contact

Lisbeth Nielsen
Chief Advisor Centre for Energy Resources (+45) 3395 4395
Maria Gry Stigø
Advisor Centre for Energy Resources (+45) 3392 4944
Benoît Bizet
Special Advisor Centre for Energy Resources (+45) 3392 6642