Here you can find material previously published in connection with news.
Tender Documents
Tender conditions for Kriegers Flak, July 2016 (Eng) (pdf)
Tender conditions for Kriegers Flak, July 2016 (Eng) (word)
Tender conditions for Kriegers Flak, July 2016 (danish) (pdf)
Tender conditions for Kriegers Flak with track changes, July 2016 (danish) (pdf)
Tender conditions for Kriegers Flak, July 2016 (danish) (word)
Grid Connection
Prelim KFA LAYOUT For information only
Prelim KFB LAYOUT For information only
Prelim KFE LAYOUT For information only
Previous Prelim Published layout Drawings
EIA reports
Reply to ESPOO response_2nd hearing_2016
Summary statement report on the EIA Report (in Danish)
EIA part 1: Non-technical resume (in English)
EIA part 1: Non-technical resume (in Danish)
EIA part 2: Purpose and background (in Danish)
EIA part 3: The marine environment (in Danish)
EIA part 4: Onshore installations (in Danish)
EIA part 5: Summary (in Danish)
Background reports
Area calculation for off shore wind farms (in English)
Arealberegning for havvindmøller (in Danish)
Arkæologisk analyse (in Danish)
Befolkning, sundhed og socioøkonomi (in Danish)
Landskab, kulturhistorie og visuelle forhold (in Danish)
Natur (in Danish) - bemærk rapporten er opdelt i 7 dele grundet filens størrelse:
- del 1 Selve baggrundsrapporten (s. 1-149)
- del 2 Bilag 1+2 (s. 150-250)
- del 3 Bilag 2 fortsat (s. 251-350)
- del 4 Bilag 2 fortsat (s. 351-450)
- del 5 Bilag 2 fortsat (s. 451-550)
- del 6 Bilag 2 fortsat (s. 551-650)
- del 7 Bilag 2 fortsat + bilag 3 (s. 651-1258)
Projekt- og anlægsbeskrivelse landanlæg (in Danish)
Radar og radiokæder (in Danish)
Landskab og vurderinger af visuelle forhold (in Danish)
Øvrige miljøforhold (in Danish)
Appropriate Assessment (in English)
Benthic habitats and communities (in English)
Underwater noise modelling (in English)
Technical project description (in English)
Legal material
02.05.2016: Guideline underwater noise
18.06.2015: The executive presentation on the possibility of changing tenderer
03.06.2015: The executive presentation on joint and several liability (pdf)
05.12.2014: Guideline underwater noise OLD VERSION (see updated 02.05.2016)
22.02.2013: Prior information notice on Horns Rev 3 and Kriegers Flak
08.02.2013: Prior Information Notice
07.02.2013: Instructions Horns Rev 3 and Kriegers Flak
08.12.2015 Bilag 6.1.1.-6.1.3. Samarbejdsaftale under Etablering (Energinet.dk) Kriegers Flak
08.12.2015 Appendix 6.4. EUROCONTROL Guidelines (Kriegers Flak)
08.12.2015 Market and Technical framework for the Danish Kriegers Flak offshore wind park
03.06.2015: The forms necessary for pre-qualification here (pdf)
06.05.2015: Contract Notice for Kriegers Flak
06.05.2015: Response to Dialogue
03.11.2014: Kriegers Flak Instructions to Energinet.dk (Danish)
07.02.2013: Requirements EIA Statement Kriegers Flak
19.02.2015: Underwater noise in relation to pile driving – Working Group 2014
Presentations and meetings
19.09.13: Horns Rev 3 & Kriegers Flak Platform Interfaces presentation
Invitation to dialogue: Summary of the market response followed by an evaluation by the DEA.
Invitation to dialogue Tenders for Horns Rev 3 and Kriegers Flak
Single line diagram for 200 MW: KFA-KFB 220-33kV 200MW platform
Single line diagram for 400 MW: KFA-KFB 220-33kV 400MW platform
Kriegers Flak - Grid Connection ready on January 1st 2019
KRIEGERS FLAK MetOcean methodology & Existing Data
HR3 meeting at ENS -11.02.2014 – on grid code compliance
Timeline for Kriegers Flak
Offshore Wind Farms (OWF) - Horns Rev 3 and Kriegers Flak - Geo Investigations 2012-2013
Q&A's for Kriegers Flak (latest update: October 26th, 2016)