Vesterhav Syd and Vesterhav Nord Offshore Wind Farms

Electricity production permit granted

The Danish Energy Agency has granted Vattenfall an electricity production permit for each of the offshore wind farms Vesterhav Syd and Vesterhav Nord. The wind farms are currently under construction and expected established and ready for production in 2023.

Tilladelse til elproduktion (tilladelse til at udnytte energien) fra havvindmølleparken Vesterhav Syd

Tilladelse til elproduktion (tilladelse til at udnytte energien) fra havvindmølleparken Vesterhav Nord

Berigtigelse af elproduktionstilladelse til Vesterhav Syd og Vesterhav Nord

Concessions Agreements for the two Nearshore wind farms signed

Concessions Agreements for the two Nearshore wind farms Vesterhav Syd and Vesterhav Nord was signed 22th of December 2016. Additionally the licenses for preinvestigations and establishment was awarded.

Documents

European Commission’s state aid decision of 3. October 2016 -  SA.43751 (2016/N) – Denmark Design and construction of a 350 MW offshore wind capacity

Vesterhav Nord

Vesterhav Syd


Earlier documents

Published material

18.07.2016: Final tender material version 2.3 with track changes (in Danish)

18.07.2016: Final tender material version 2.3 with track changes (in English)

31.05.2016: Final Licences for Construction (in English):

31.05.2016: Bilag 9.4: Pålæg til Energinet.dk om nettilslutning (in Danish)

29.04.2016: Draft licenses for construction – in Danish:

Udkast til Samarbejdsaftale mellem Eneginet.dk og koncessionshavre vedr. anlæg, drift og kobling – Appendix 9.1 – only in Danish

18.08.2015: The executive presentation on joint and several liability

18.08.2015: Revised version of the executive presentation on the possibility of changing tenderer

03.03.2015: Amended Executive Order no. 220 regarding grid connection of nearshore wind turbines (in Danish)

20.02.2015: Contract notice for the nearshore wind tender of 350 MW

Presentations

17.02.16: Presentation on house prices (in Danish Only)   

18.01.16: Presentation of right of way and compensation

18.01.16: Presentation on cable routing and installation

05.03.15: Presentation from grid seminar – DEA

05.03.15: Presentation from seminar on grid analysis

27.02.15: Presentation from MetOcean seminar - Energistyrelsen

27.02.15: Presentation from MetOcean - Presentation by COWI

05.12.14: Geotechnical surveys introductions

05.12.14: Geotechnical surveys - UXO Conditions

Publications

02.05.2016: Guideline underwater noise

08.10.2015: Underwater noise in relation to pile driving – Working Group 2014

08.10.2015: Guideline underwater noise OLD VERSION (updated 02.05.2016)

20.03.2015: Grid connection of near-shore wind farms, by Energinet.dk

03.03.2015: Memo on grid connection of nearshore wind turbines established by tendering procedure

02.03.2015: Nettilslutning af kystnære havmølleparker, af Energinet.dk

Contact

Tobias Grindsted
Chief Advisor (+45) 3392 6640
Anja Lundberg
Special Advisor (+45) 3392 6819