Publication of results from the preliminary site investigations – Offshore wind Baltic Sea (Bornholm)
In relation to the tendering of the offshore windfarms of the Energy Island Bornholm, a range of preliminary investigations and environmental assessments are being carried out.
Results in the form of reports and data from the completed investigations can be accessed directly here at this site (reports) and through access to a FTP site (data), which is maintained by Energinet. All results from the preliminary investigations etc. are targeted potential bidders for the offshore windfarms of the Energy Island Bornholm.
Access to Energinet's FTP site
Access to Energinet’s FTP site is obtained in the following way:
Step 1: Send the request to FTPenergyislands@ens.dk, and include the following information:
Applicant name (company name or name of the consortium)
Applicant’s contact person, (name)
Applicant’s contact person, (email)
Applicant’s contact person, (telephone number)
Step 2: Energinet will thus send instructions to the applicant on access to the FTP server with username and password.
The FTP website will be updated in accordance with the plan mentioned in the table below. Reports, which are related to the environment and other reports, which do not require FTP server, will be posted on this page.
We aim to process requests within five working days, bank holidays and holiday excluded.
Access to Energinet's Azure Data Solution
Access to Energinet’s Azure Data Solution for the Bornholm Energy Island is obtained in the following way: Guide on how to access Energinet’s Azure data solution
Data will be available on Azure during October 2024.
Results from preliminary investigations as well as data for the offshore windfarms in the Baltic Sea (Bornholm)
Below you can find the list of all investigations to be carried out including notes describing the reports. Included in the list the timing of the publishing of the reports is mentioned.
Metocean
ID |
Deliverables |
Date |
Note |
---|---|---|---|
3101 |
LiDAR Buoy Measurements (data) |
Apr 2022 |
|
3102 |
Measurements Offline Instruments (data) |
Apr 2022 |
|
3103 |
LiDAR Buoy Monthly Measurement Reports |
Jan 2024 |
|
3104 |
Supplementary Measurement Reports Offline Instruments |
May 2024 |
Merged with 3105 |
3105 |
Final Measurement Reports |
May 2024 |
Published |
3106 |
Measurement Plan |
Apr 2022 |
Published on FTP-server |
3107 | Site Metocean Conditions Assessment Report - Part A Site Metocean Conditions Assessment Report - Part B |
Mar 2024 |
Published. |
Note Reassessment Site Metocean Condition | Aug 2024 | Published | |
3108 | Site Wind Conditions Assessment Report | Oct 2023 |
Published. Report updated November 2023 |
Note Reassessment Site Wind Conditions | Apr 2024 | Published | |
3109 | Site Ice Conditions Assessment Reports | Mar 2024 | Published |
3110 |
Feasibility Statement From Certification Body |
Apr 2024
Aug 2024 |
Published
Published |
3111 | WRF model for Energy Island Bornholm | Aug 2024 | Published |
3112 |
Motion Correction of Turbulence Intensity |
Aug 2024 | Published |
Baseline reports
ID |
Deliverables |
Date |
Note |
---|---|---|---|
3201 |
Sep 2022 |
|
|
3202 |
Sep 2022 |
|
|
3203 |
Oct 2022 |
|
|
3204 |
Oct 2022 |
|
|
3205 |
Sep 2022 |
|
Technical reports and reports on environment
ID |
Deliverables |
Date |
Note |
---|---|---|---|
3206 |
Visibility Analysis, Report |
Oct 2023 |
Published |
3207 |
Nov 2023 |
Published (Data on Azure) |
|
3208 |
May 2024 |
Published (Data on Azure) |
|
3209 |
May 2024 |
Published (Data on Azure) |
|
3210 |
Apr 2024 |
Published (Data on Azure) |
|
3211 |
Oct 2023 |
Published (Data on Azure) |
|
3212 |
Sept 2023 |
Published |
|
3213 |
Jul 2023 |
Published |
|
3214 |
Dec 2022 |
Published |
|
3215 |
Maritime Traffic and Safety of Navigation (HAZID) Skibstrafik og sejladssikkerhed (HAZID) |
Dec 2022 |
Published |
Seabed investigations
Strategic Environmental Assessments (SEA)
ID |
Deliverables |
Date |
Note |
---|---|---|---|
3401 |
Scoping of Strategic environmental assessment (SEA) for Energy Island Bornholm (Afgrænsningsudtalelse for miljøvurdering af plan for Energiø Bornholm) |
Jun 2022 |
|
3402 |
Strategic Environmental Assessment Report (SEA) Miljørapport – Delrapport 1: Ikke teknisk resumé og sammenfattende redegørelse |
Oct 2023 |
Published |
3403 |
The Plan for the Programme Bornholm Energy Island (Plan for Program Energiø Bornholm) |
May 2024 |
Published |
3404 |
(Sammenfattende redegørelse) |
May 2024 |
Published |
Q&A submitted under the phase of publication of results from the preliminary site investigations.