Preliminary investigations

In relation to the tendering of Thor Offshore Wind Farm, a range of preliminary investigations and environmental assessments are being carried out.

Results in the form of reports and data from the completed investigations can be accessed directly here at this site (reports) and through access to a FTP site (data), which is maintained by Energinet. All results from the preliminary investigations etc. are targeted potential bidders for Thor.

Access to Energinet's FTP site

Access to Energinet’s FTP site is obtained in the following way:

Step 1: Interested bidders can request access to the data by notifying the Danish Energy Agency. Send the request to Jeppe Lundbæk, email jel@ens.dk , and include the following information:

  1. Applicant name (company name or name of the consortium)
  2. Applicant’s contact person, (name)
  3. Applicant’s contact person, (email)
  4. Applicant’s contact person, (telephone number)

Step 2: Energinet will thus send instructions to the applicant on access to the FTP server with username and password.

The FTP website will be updated in accordance with the plan mentioned in the table below. Reports, which are related to the environment and other reports, which do not require FTP server, will be posted on this page. A smaller part of the MetOcean data (report #102 and #103) will only be available in the beginning of 2021, and will exclusively be available for prequalified bidders, who has signed an NDA.

The preliminary investigations as well as the compilation of the complete environmental report (SEA) including the summarising statement and hearing will be completed by 1 April 2021 at the latest, in order for bidders to be able to familiarise themselves with these prior to the deadline for submitting final bids.

Results from preliminary investigations as well as data

Below you can find the list of all investigations to be carried out including notes describing the reports. Included in the list the timing of the publishing of the reports is mentioned. Click here to read the notes.

MetOcean

ID Delieverable Date Note
101 Lidar-measurements Continously, latest data medium 202 Note 7
102 Report on wind resources (Mesoscale)
The background data for #102 are confidential and requires an NDA.
2021 Mar Note 8
103

Report on Ocean data (Hindcast)
The background data for #103 are confidential and requires an NDA.

Metocean report

Wind conditions for a light site conditions assessment

Overview delivery of data and reports

Description of measurement datasets

Dnvgl statement of feasibility

Dnvgl certification report

Published Note 9

 

Environmental assessments and permits 

ID Delieverable Date Note
201 Scoping of SEA for Thor OWE (afgrænsningsudtalelse) Published Note 10
202 Scoping of EIA of the land-based project for Thor OWF (afgrænsningsudtalelse) Published Note 11
203 Municipal plan (kommuneplan-tillæg) and local plan (lokalplan) for expansion of Idomlund substation agreed and published (Planning consent for extension of Idomlund sub-station approved and made public) Published Note 23
204 Municipal plan (kommuneplan-tillæg) and local plan (lokalplan) for nearshore substation at Volder Mark agreed and published (Planning consents for new Volder Mark sub-station approved and made public) Published Note 12
205 Environmental report (SEA) for the plan for Thor OSW (SEA report for Thor OWF) 2021 Feb Note 13

206

EIA report for the land-based project submitted 2021 April Note 14
207 EIA permit for land-based project obtained 2021 Aug Note 15
208 SEA summary statement 2021 April Note 24

 

Technical reports and reports on environment

ID Delieverable  Date Note
209 Birds Published Note 1
210 Marine mammals Published Note 16
211 (Sea) Bottom fauna and flora
Appendix
Published Note 17
212

Visibility analyses 
Appendix 
(in Danish)

Published Note 18
213 Assessment of safety of navigation Published Note 19
214 Radio links and radar Published Note 20
215

Fish and fish populations

Commercial fisheries

Published Note 21
216 Underwater noise Published Note 22

 

Seabed investigations 

ID Delieverable Date Note
  Geophysical survey    
301 - Geophysical survey report, wind farm site Published Note 1
302 - Export cables routes survey report  Published Note 1
303 - Hydrographical report, wind farm site Published Note 2
304 - Hydrographical report, export cable routes Published Note 3
305 Marine archeaology Thor 
Marine geoarchaeaology Thor 
Marine Archeaology Target list
 
Published Note 4
306 UXO risk assessment report Published Note 1
  Geotechnical investigations    
307 - Geological desk study Published Note 1
308 - Geotechnical investigation report, main rapport

Geotechnical investigation, A.01-A.04

Geotechnical investigation, B.01-B08

Geotechnical investigation, C.01-C.03

Geotechnical investigation, D.01-D.08 (Part 1)

Geotechnical investigation, D.01-D.08 (Part 2)

 

Published Note 5
309

Geomodel report with appendices

Overview maps

Geotech

Model layers DBS

Model layers Isopach

Cross sections

Seismic Int gas organic

Published Note 6
310 Desk study: Metocean weather windows Published Note 1